We were contacted by the owner of an industrial premises to lay a concrete factory floor in Speke. The new concrete floor was to be laid over a rough but solid existing floor that contained train tracks etc. We overlaid the existing floor in 150mm of fibre concrete that was completedĀ in 2 500 m2 poursĀ to a polished finish with ramps …